Lighting Chain (Rope Lights) BIS Certification
BIS certification is compulsory for lighting chain (Rope lights). Manufacturers need CRS registration under IS 10322 (Part 5)Section 9: 2017 before the product can be made, imported or sold in India.
Lighting Chain (Rope Lights) BIS certification at a glance
| Scheme | CRS registration (Scheme-II) |
|---|---|
| Indian Standard | IS 10322 (Part 5)Section 9: 2017 : Luminaries: Part 5 Particular Requirements Section 9 Rope Lights |
| Category | Electronics & IT Goods |
| Notified under | BIS notification, SO 1236 (E), dated 01st April, 2020 · Order PDF |
| Mark on product | The BIS Standard Mark (CRS) with the IS number and the R-number |
| Apply on | crsbis.in |
Who needs it
Any manufacturer making lighting chain (Rope lights) for the Indian market, and any importer bringing it in, needs the product covered by a valid BIS registration (CRS). Registration is granted to the manufacturer for a specific factory, brand and models. Overseas manufacturers must appoint an Authorised Indian Representative to apply and hold the registration in India.
Without it, the goods cannot be manufactured, imported, sold, distributed or stored for sale. Contravening Section 17 of the BIS Act, 2016 can lead to imprisonment of up to two years, or a fine of at least ₹2 lakh (₹5 lakh for repeat contraventions) that can reach ten times the value of the goods, or both.
How to get BIS certification for lighting chain (Rope lights)
- Confirm the Indian Standard and group models into a series
- Submit samples to a BIS-recognised lab in India for testing
- Apply on the CRS portal with the test report, factory and brand documents
- BIS review and grant of the R-number registration
- Mark products with the Standard Mark, IS number and R-number
Testing. Samples are type-tested at a BIS-recognised laboratory in India; foreign lab reports are not accepted. BIS then reviews the test report and documents and grants the registration. Market surveillance samples follow.
Timeline. Lab testing usually takes 2 to 6 weeks; BIS processing typically takes another 3 to 6 weeks after a complete application with the test report.
Fees. Application and annual licence fees of ₹1,000 each, a processing fee of ₹25,000 per year, and ₹20,000 for each additional test report, plus lab testing charges (BIS Conformity Assessment Amendment Regulations, 2026).
Validity. Registrations can be granted for up to 5 years and renewed for further periods of up to 5 years, with fees paid annually.
For the full process, see our BIS CRS registration guide and how to check an R-number.
Frequently asked questions
Is BIS certification mandatory for lighting chain (Rope lights)?
Yes. BIS certification for lighting chain (Rope lights) is compulsory under the BIS notification, SO 1236 (E). The product cannot be manufactured, imported, sold or stored for sale in India without a valid BIS registration (CRS) and the BIS Standard Mark (CRS) with the IS number and the R-number.
Which Indian Standard applies to lighting chain (Rope lights)?
IS 10322 (Part 5)Section 9: 2017 (Luminaries: Part 5 Particular Requirements Section 9 Rope Lights). The product must meet this standard as current on the date of testing.
How long does BIS certification for lighting chain (Rope lights) take?
Lab testing usually takes 2 to 6 weeks; BIS processing typically takes another 3 to 6 weeks after a complete application with the test report.
Can a foreign manufacturer get BIS certification for lighting chain (Rope lights)?
Yes. The overseas manufacturer registers its own factory on the CRS portal through an Authorised Indian Representative based in India; samples must be tested at a BIS-recognised lab in India.
What mark must appear on lighting chain (Rope lights)?
The BIS Standard Mark (CRS) with the IS number and the R-number, applied as the BIS marking guidelines require, on the product and its packaging.
Related products under BIS
- LED Luminaires (Fixed General Purpose) IS 10322 (Part 5/Sec 1)
- Recessed LED Luminaires IS 10322 (Part 5/Section 2): 2012
- LED Street Lights IS 10322 (Part 5/Section 3): 2012
- LED Flood Lights IS 10322 (Part 5/Section 5): 2013
- LED Hand lamps IS 10322 (Part 5/Section 6): 2013
- LED Lighting Chains IS 10322 (Part 5/Section 7): 2013
- LED Luminaires for Emergency Lighting IS 10322 (Part 5/Section 8): 2013
- Electronic Games (Video) IS/IEC 62368: Part 1: 2023
Source: BIS list of products under compulsory certification (Scheme-II), checked October 2026. Orders change often; confirm the current notification before applying.
Not sure which certification your product needs?
Talk to a team led by former BIS Directors. We'll map every approval your product needs before you spend on testing.