BIS has changed how foreign factories get an ISI licence. A circular from its Central Marks Department, Ref CMD-I/2:12:1 dated 23 November 2026, sets out supplementary guidelines for grant of licence under the Foreign Manufacturers Certification Scheme (FMCS). It applies to all FMCS applications for grant of licence and takes effect immediately.
In short, testing now starts before the inspection instead of after it. The applicant sends its own samples to a laboratory in India while BIS processes the file. BIS grants the licence on those reports and a satisfactory inspection, and tests the sample its officer draws at the factory afterwards. That should cut months off a typical application. In return, the rules on failure are stricter: one failed test of the applicant’s samples can end the application, and a failed BIS sample after grant suspends the licence at once.
At the time of writing, the circular is not posted on BIS’s public FMCS pages. It is to be read with BIS’s Guidelines for Grant of Licence dated 25 February 2026 (the GoL guidelines), and everything in those guidelines that it does not change still applies.
What changed at a glance
| Before | Under the 23 November 2026 guidelines | |
|---|---|---|
| Testing for grant | Samples drawn by the BIS officer at the inspection, tested in India | Samples the applicant selects, tested at a BIS or BIS-recognised laboratory in India in parallel with scrutiny and the inspection |
| Sample drawn at the inspection | Its test result was needed for grant | Still drawn, but its result is not awaited for grant; used to review the licence afterwards |
| Who pays for testing | The manufacturer | Applicant pays for its own samples; BIS pays for the sample its officer draws |
| A failed sample before grant | A second test could be allowed under the GoL guidelines | Rejection at the first failure if no variety conforms; no second test |
| A failed BIS sample after grant | No licence yet | Immediate suspension, without prior notice |
| Timeline | BIS’s FMCS FAQs gave an average of about six months | Normally 180 days, if the applicant completes its actions on time |
| Applicant’s undertaking | None specific to these rules | New undertaking (Annexure-II), checked at the inspection |
The new FMCS process step by step
- Apply. The application is filed with the documents listed in clause 2 of the GoL guidelines and the FMCS requirements, on Manak Online as before.
- BIS’s action letter. After review, BIS writes to the applicant (Annexure-I of the circular) listing what it must do: send samples for testing, pay the visit charges, propose inspection dates and correct any deficiencies found in the documents. A complete reply is due within 30 days. If the actions are not completed in that time, BIS will presume the applicant is no longer interested, and the application is liable to be rejected as incomplete.
- Undertaking. The applicant signs an undertaking on its letterhead (Annexure-II), addressed to the Head of FMCD, accepting the conditions summarised below.
- Test self-selected samples in India. The applicant picks samples to cover every variety it wants in the licence, following the grouping guidelines and sample quantities in the product’s Product Manual. It can use any laboratory established, maintained, recognised or empanelled by BIS that is approved for the product, found through BIS’s lab search by IS number. The test request is generated on the BIS portal, the charges are paid directly to the laboratory, and the applicant sends BIS the test request and proof of sample submission and payment.
- Factory inspection, in parallel. The proposed inspection dates must fall 30 to 60 days from BIS’s letter. Pending test reports do not, on their own, hold up planning or conduct of the visit. The inspection itself follows clause 5 of the GoL guidelines, and the officer checks the undertaking.
- Independent sample. The officer draws an independent sample and a counter sample, and issues a test request naming the laboratory. The applicant is responsible for transporting the independent sample there.
- Grant. BIS considers grant once the application scrutiny and inspection are satisfactory, any corrective actions are verified, and conformity is established through the self-selected test reports and any tests witnessed at the inspection. Before granting, BIS verifies proof of dispatch of the independent sample. It does not wait for that sample’s test report.
After grant, BIS’s Foreign Manufacturers Certification Department (FMCD) follows up with the laboratory for the independent sample’s report.
Testing your own samples: what the guidelines require
The applicant is responsible for choosing which varieties to test. The circular ties this to the product’s grouping guidelines so that the tests cover every variety proposed for the licence. Some details worth knowing:
- Reports must be complete. It is the applicant’s job to make sure reports cover the whole Indian Standard. Partial reports are handled under clause 4(i) of the GoL guidelines. Where testing has to be completed during the inspection, the applicant must provide the facilities and material.
- Long-duration tests follow clauses 4(j), 4(k) and 5(g) of the GoL guidelines, with the Annexure-III undertaking from those guidelines where it applies.
- Raw materials, where the product standard requires their conformity, are established under clause 4(h) of the GoL guidelines.
- Partial conformity narrows the licence. If several varieties are tested and only some conform, the licence can be granted for those varieties only.
- No conformity means rejection. If no variety conforms, the application is processed for rejection under regulation 4(6) of the BIS (Conformity Assessment) Regulations, 2018. The circular says non-conformity at the first instance is sufficient, and the provision for testing a second time does not apply.
That last point is the biggest practical change. Under the earlier process an exporter could rely on the BIS officer to draw samples. Now the exporter chooses what to send, and a sample that fails can end the application. Pre-testing, and a careful choice of varieties, is worth the cost.
The 180-day timeline
The circular says application processing is normally expected to take 180 days, provided the applicant completes its actions on time: depositing the self-selected samples at the laboratory, paying the fees and confirming inspection dates. It can take longer where:
- testing the product takes more than 30 days,
- visa formalities take more than 30 days, or
- transit and deposit of samples at the laboratory take more than 30 days.
Combined with the 30-day reply deadline and the 30-to-60-day inspection window, the guidelines put the pace in the applicant’s hands. Most delays will now come from the applicant’s side: samples that arrive late, a slow reply, or inspection dates that can’t be confirmed.
Who pays for testing
- Self-selected samples: the applicant, paid directly to the laboratory.
- The independent sample drawn at the inspection: BIS.
- After a suspension: the applicant pays for testing the fresh samples and for the visit to verify corrective action and draw them, including travel and incidental expenses.
The applicant still pays the visit charges for the preliminary inspection and arranges the officer’s visa, travel and stay, as before.
If the BIS sample fails after grant
If the independent sample conforms, BIS records the result and the licence operates normally.
If it does not conform, the licence is put under suspension immediately, without prior intimation. This applies even if surveillance samples drawn after grant have passed. Under the undertaking, the licensee then has 30 days from the date of suspension to:
- take corrective action and inform BIS, and
- confirm it is ready to offer fresh samples made after that corrective action.
BIS considers revoking the suspension on conforming test reports of the fresh samples from a third-party laboratory. If the fresh samples fail, or the licensee misses the 30 days, BIS starts proceedings to cancel the licence. Failures in long-duration tests, or reports not submitted on time, are handled under clause 8(d) of the GoL guidelines. Later surveillance failures follow BIS’s separate guidelines on operation of licences (Ref CMD-I/2:12:2, Parts 1 and 2, dated 25 February 2026). Rejection and appeals follow clauses 10 and 17 of the GoL guidelines.
What the new undertaking commits you to
Annexure-II is signed by a member of management or the authorised signatory. In it the applicant confirms that it:
- understands the consequences if its own samples or BIS’s sample fail,
- will select samples to cover all varieties, for testing in a BIS or BIS-recognised laboratory in India,
- accepts rejection at the first failure, with no second test,
- will deliver BIS’s independent sample to the named laboratory and submit the laboratory’s acknowledgement,
- will pay for testing its own samples,
- accepts immediate suspension if BIS’s sample fails, and the 30-day corrective action deadline, and
- will pay the costs of retesting and the verification visit after a suspension.
Read it before you sign. The officer checks it at the inspection.
What to do now
- If you have an application in progress, ask FMCD how the circular applies to it. The circular says it applies to all applications for grant of licence and takes effect immediately, but it does not say how it applies to a file that is already partway through the old process.
- Pick your samples before BIS asks. Check the Product Manual for the grouping guidelines and sample quantities, and decide which varieties will represent the range.
- Pre-test. Given first-fail rejection, test against the full Indian Standard, at your own laboratory or a laboratory you trust, before sending samples to the Indian laboratory.
- Line up an Indian laboratory and courier now. You have 30 days to deposit samples. Check which laboratories are approved for your Indian Standard, their queue, and how samples will clear Indian customs.
- Have inspection dates and visa support ready. The dates you propose must fall 30 to 60 days from BIS’s letter.
- Plan for the independent sample. The licence is granted only after BIS sees proof it was sent, so arrange its transport to India before the officer leaves.
For the full FMCS process, including the AIR, fees and obligations after grant, see our FMCS guide for exporters and BIS certification for foreign manufacturers.
How Aaditech can help
Aaditech helps overseas manufacturers through FMCS from New Delhi, where BIS’s Foreign Manufacturers Certification Department sits. Under the new guidelines that means choosing the varieties to test, pre-testing against the Indian Standard, booking a BIS-recognised laboratory and getting samples there within 30 days, answering BIS’s action letter, preparing the factory for the inspection and delivering BIS’s sample. Our founders served as Directors at BIS. See our BIS FMCS certification service.