BIS FAQs on Migration to IS/IEC 62368-1:2023 (July 2026)

BIS's 17 answers on moving a CRS licence to IS/IEC 62368-1:2023: R-numbers stay the same, every lead model is retested, and migration carries no fee.

Issued byBureau of Indian Standards
Edition22 July 2026
Length4 pages, PDF
StatusCurrent. Read with the BIS migration guideline of 9 March 2026, which prevails if the two differ.
Official copycrsbis.in
Our copyDownload PDF, saved from the official source

What this document is

BIS published these 17 questions and answers on 22 July 2026. They deal with the practical points that came up after the migration guideline of 9 March 2026. The FAQs say the guideline, the BIS Act, 2016 and the Conformity Assessment Regulations, 2018 prevail if anything in them conflicts.

The licence and the mark

  • R-numbers stay the same after migration (Q1).
  • Separate licences stay separate. For example, power adaptors for IT equipment and power adaptors for audio-video apparatus keep their own licences, and each is migrated on its own (Q2).
  • Marking. The Standard Mark follows Scheme-II marking rules, showing IS/IEC 62368-1 with the R-number (Q3).
  • Laboratories recognised for IS/IEC 62368-1:2023 are listed on the BIS LIMS portal (Q4).

Renewals, new applications and new models

  • A licence due for renewal can be renewed under the old standards until 1 November 2028 (Q5).
  • New applications can still be made under either standard until then, but BIS encourages applicants to use IS/IEC 62368-1:2023 (Q6).
  • New models tested to IS/IEC 62368-1:2023 can be added to a licence first granted under IS 13252 (Part 1) or IS 616 (Q7).

Testing for migration

  • Every lead model previously tested to the old standard needs a complete report under the new one, chosen under the revised series guidelines. One sample per licence is not enough (Q8).
  • End-of-life lead models can be withdrawn from the licence, and the next suitable lead model in the series tested instead (Q9).
  • Each factory needs its own reports, because each manufacturing location holds a separate licence (Q10).
  • Components and end products can be tested in parallel under the BIS parallel testing guidelines (Q12).
  • Critical components listed in the test report must comply with IS/IEC 62368-1:2023. Components that meet only IS 13252 (Part 1) or IS 616 are not accepted (Q14).
  • Samples already carrying the Standard Mark can be tested, as long as the applicant tells the laboratory and the report records it (Q15).
  • Testing can start before the migration application is filed (Q16).

Applying and fees

Licensees apply through the Standard Revision/Amendment/Essential Requirement option in their CRS login, with reports for all lead models (Q17). No fee is charged for migrating models already in the licence through that route (Q13).

What to watch

Several answers refer to revised series guidelines from MeitY for IS/IEC 62368-1:2023. We have not found them published yet. Until they are, plan lead models using the existing series guidelines and confirm the grouping with the laboratory. For registration basics, see our CRS registration guide, and to check a registration, see how to check an R-number.

Products this document applies to

Each product page shows the Indian Standard, the notifying order and how to register.

About IS/IEC 62368 and its BIS labs

Frequently asked questions

Does the R-number change after migration to IS/IEC 62368-1:2023?

No. BIS's FAQs confirm the existing registration number stays the same after a successful migration. Separate licences for different product categories also stay separate, and each one is migrated on its own.

Is there a fee for migrating to IS/IEC 62368-1:2023?

No fee applies to migrating models already registered in the licence, provided the request goes through the Standard Revision option in the licensee's CRS login. Testing at the laboratory is still paid for.

Can one sample per R-number be tested for migration?

No. Complete test reports are needed for every lead model in the licence that was tested to the old standard, identified under the revised series guidelines. If a lead model has reached end of life, it can be withdrawn and the next suitable model in the series used instead.

More in IS/IEC 62368-1:2023 migration

Also on our CRS guidelines page: Series guidelines · CRS FAQs · Product standards · Solar PV

All CRS guidelines and FAQs

Related guides from our team

This page is our summary of an official document, written for general guidance. The PDF is the authoritative text. BIS and MeitY revise these documents from time to time, so check the official source or speak to our team before acting. Published 22 July 2026.