Skip to content
Indian Standard · CRS

IS/IEC 61730 BIS Certification

2 products must be certified by BIS against IS/IEC 61730 and be registered under CRS. Find your product and its exact part below.

Products under IS/IEC 61730

ProductPart / editionScheme
Crystalline Silicon Solar Panels (PV Modules) IS/IEC 61730 -1
Crystalline Silicon Terrestrial Photovoltaic (PV) modules – Design Qualification And Type Approval
CRS
Crystalline Silicon Solar Panels (PV Modules) IS/IEC 61730 -2
Crystalline Silicon Terrestrial Photovoltaic (PV) modules – Design Qualification And Type Approval
CRS
Thin-Film Solar Panels (PV Modules) IS/IEC 61730 -1
Thin-Film Terrestrial Photovoltaic (PV) Modules – Design Qualification and Type Approval
CRS
Thin-Film Solar Panels (PV Modules) IS/IEC 61730 -2
Thin-Film Terrestrial Photovoltaic (PV) Modules – Design Qualification and Type Approval
CRS

Parts of IS/IEC 61730 at a glance

PartCurrent editionAmendments
IS/IEC 61730 -1
Crystalline Silicon Solar Panels (PV Modules), Thin-Film Solar Panels (PV Modules)
IS/IEC 61730 (Part 1):2023 0
IS/IEC 61730 -2
Crystalline Silicon Solar Panels (PV Modules), Thin-Film Solar Panels (PV Modules)
IS/IEC 61730 (Part 2):2023 0

Details by part

IS/IEC 61730 -1 Crystalline Silicon Solar Panels (PV Modules), Thin-Film Solar Panels (PV Modules)

Editions and amendments of IS/IEC 61730 -1

EditionPublishedStatus
IS/IEC 61730 (Part 1):2023
Photovoltaic (PV) Module Safety Qualification Part 1 Requirements for Construction (Second Revision)
20 Jun 2025Current, next review 1 Jun 2030
IS/IEC 61730 (Part 1):2004
Photovoltaic (PV) Module Safety Qualification Part 1 Requirements for Construction
30 Jun 2019Current, next review 30 Jun 2024
IS/IEC 61730 (Part 1):2016
Photovoltaic (PV) Module Safety Qualification Part 1 Requirements for Construction ( First Revision )
30 Jun 2019Current, next review 4 Apr 2029

BIS lists 3 current editions of IS/IEC 61730 -1. During a changeover both can be used until the date BIS sets for moving to the newer one.

No amendments to the current edition are listed by BIS.

IS/IEC 61730 -2 Crystalline Silicon Solar Panels (PV Modules), Thin-Film Solar Panels (PV Modules)

Editions and amendments of IS/IEC 61730 -2

EditionPublishedStatus
IS/IEC 61730 (Part 2):2023
Photovoltaic (PV) Module - Safety Qualification Part 2 Requirements for Testing (Second Revision)
20 Jun 2025Current, next review 1 Jun 2030
IS/IEC 61730 (Part 2):2004
Photovoltaic (PV) Module Safety Qualification Part 2 Requirements for Testing
30 Jun 2019Current, next review 30 Jun 2024
IS/IEC 61730 (Part 2):2016
Photovoltaic (PV) module safety qualification: Part 2 requirements for testing (First Revision)
30 Jun 2019Current, next review 4 Apr 2029

BIS lists 3 current editions of IS/IEC 61730 -2. During a changeover both can be used until the date BIS sets for moving to the newer one.

No amendments to the current edition are listed by BIS.

Notifying orders

  • Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017, S.O. 2920(E), dated 30 August 2017 · PDF

How to get CRS registration under IS/IEC 61730

Registration is granted to the manufacturer for a specific factory, brand and models. Overseas manufacturers must appoint an Authorised Indian Representative to apply and hold the registration in India.

  1. Confirm the Indian Standard and group models into a series
  2. Submit samples to a BIS-recognised lab in India for testing
  3. Apply on the CRS portal with the test report, factory and brand documents
  4. BIS review and grant of the R-number registration
  5. Mark products with the Standard Mark, IS number and R-number

Timeline. Lab testing usually takes 2 to 6 weeks; BIS processing typically takes another 3 to 6 weeks after a complete application with the test report.

Fees. Application and annual licence fees of ₹1,000 each, a processing fee of ₹25,000 per year, and ₹20,000 for each additional test report, plus lab testing charges (BIS Conformity Assessment Amendment Regulations, 2026).

Mark. Certified products carry the BIS Standard Mark (CRS) with the IS number and the R-number.

Frequently asked questions

Is BIS certification mandatory for products under IS/IEC 61730?

Yes, for the 2 products listed on this page. Each is notified by a government order and needs a valid BIS registration (CRS) before it can be made, imported or sold in India. Other products that merely use IS/IEC 61730 are not automatically covered.

Which part of IS/IEC 61730 applies to my product?

IS/IEC 61730 has 2 parts or editions referenced in BIS orders. Find your product in the table above to see its exact part. Where a product is covered by more than one standard, all of them apply.

How long does CRS registration under IS/IEC 61730 take?

Lab testing usually takes 2 to 6 weeks; BIS processing typically takes another 3 to 6 weeks after a complete application with the test report.

Other standards in Solar PV Systems & Components

  • IS 14286 Crystalline Silicon Solar Panels (PV Modules)
  • IS 16077 Thin-Film Solar Panels (PV Modules)
  • IS 16169 Solar Inverters and Power Converters
  • IS 16221 Solar Inverters and Power Converters
  • IS 16270 Grid-Tied Solar Inverters

Source: BIS lists of products under compulsory certification (Scheme-I, Scheme-II), checked October 2026. See the full BIS product list or all Indian Standards.

Not sure which certification your product needs?

Talk to a team led by former BIS Directors. We'll map every approval your product needs before you spend on testing.

Call WhatsApp Get a quote