Skip to content
BIS certification guide

BIS Certification for Solar Panels, Inverters and Batteries

Solar panels, solar inverters and off-grid solar batteries need BIS registration under MNRE's Solar Systems, Devices and Components Goods Order, 2025, with a minimum efficiency for panels. Solar DC cable and solar water heater parts are under the ISI mark through separate orders. ALMM is a different list, kept by MNRE for projects.

BIS for solar products?

Tell us the product and we'll confirm which rule applies.

We reply within one working day. Prefer to talk? +91 99538 54092

Updated 23 November 2026. Checked against the BIS lists of products under compulsory certification and the orders in the Gazette of India.

Which BIS rule applies to your solar product

ProductWhat it needsIndian StandardNotified under
Crystalline silicon PV modules (mono and poly)Registration (Scheme-II), plus minimum efficiencyIS 14286 (Part 1) and (Part 1/Sec 1):2023, IS/IEC 61730-1 and -2MNRE’s Solar Systems, Devices and Components Goods Order, 2025, S.O. 492(E)
Thin-film PV modules (CdTe, a-Si, CIGS)Registration (Scheme-II), plus minimum efficiencyIS 14286 (Part 1):2023 with Sec 2, 3 or 4, IS/IEC 61730-1 and -2Same order
Inverters for PV power systemsRegistration (Scheme-II)IS 16221 (Part 2):2015, IS/IEC 61683:1999Same order
Utility-interconnected (grid-tied) PV invertersRegistration (Scheme-II)IS 16221 (Part 2):2015, IS 16169:2019, IS 17980:2022Same order
Storage batteries for off-grid solar PVRegistration (Scheme-II)IS 16270:2023Same order
Solar DC cable, up to 1500 V DCISI mark licenceIS 17293:2020Solar DC Cable and Fire Survival Cable (Quality Control) Order, 2023, S.O. 3807(E)
Solar flat plate collectorsISI mark licenceIS 12933 (Parts 1 and 2)MNRE’s Solar Thermal Systems, Devices and Components (Quality Control) Order, 2024, S.O. 4485(E)
All-glass evacuated tube solar water heating systemsISI mark licenceIS 16544:2016Same order
Storage tanks for evacuated tube systemsISI mark licenceIS 16542:2016Same order
Solar PV water pumpsNot yet compulsory; proposed in a draft orderIS 17018 (Part 1)Draft Pumps QCO, 2026, not notified

The 2025 solar order

MNRE issued the Solar Systems, Devices and Components Goods Order, 2025 as S.O. 492(E) on 27 January 2025. It replaced the 2017 solar CRS order and came into force 180 days after publication, on 26 July 2025. It lists five products: crystalline and thin-film PV modules, storage batteries, inverters for PV power systems and utility-interconnected inverters. Each must meet the listed Indian Standards and carry the Standard Mark under a BIS licence in Scheme-II, the registration scheme.

Four other points in the order matter in practice:

  • Export goods are outside it. The order does not apply to goods made for export.
  • 2017 registrations stay valid until they expire. New registrations, and renewals after expiry, follow the 2025 order and its standards.
  • The latest edition applies. A revised Indian Standard or amendment applies from the date BIS notifies it, which is why the module and battery standards have kept moving since 2025.
  • MNRE’s rules, not MeitY’s. Solar goods are registered on BIS’s CRS portal, but MeitY’s CRS FAQs and series guidelines do not apply to them. Inverters are grouped into series under MNRE’s own guidelines of 26 August 2019, and batteries by rated capacity under MNRE’s storage battery series guidelines, still a draft.

Overseas manufacturers apply through an Authorised Indian Representative, and samples are tested at a BIS-recognised laboratory in India; foreign test reports are not accepted.

Solar panels: IS 14286, IS/IEC 61730 and minimum efficiency

The order lists two kinds of module. Crystalline silicon (wafer-based) modules must meet IS 14286 (Part 1):2023 and its Section 1 for crystalline silicon. Thin-film modules must meet IS 14286 (Part 1):2023 with Section 2 for cadmium telluride, Section 3 for amorphous silicon or Section 4 for CIGS. These replace IS 14286:2010 and IS 16077:2013, which BIS withdrew on 15 February 2026. Both kinds also need IS/IEC 61730-1 and 61730-2, the module safety standards for construction and testing.

Minimum efficiency. Clause 10 of the order makes efficiency at standard test conditions a condition of grant: at least 18% for monocrystalline and thin-film modules and 17% for polycrystalline modules. Efficiency is the module’s maximum power in watts divided by 1,000 times the area of its front surface in square metres, as measured under IS 14286. The laboratory reports the maximum power, area and efficiency in the test report.

IS/IEC 61730:2023. The order named the 2016 editions of IS/IEC 61730, which have since been revised. BIS’s guideline of 30 December 2025 runs the 2016 and 2023 editions together until 15 February 2027. After that date no licence, change in scope or standard revision is granted for modules without the 2023 editions, and models still on 2016 are deleted from the licence. Models already tested to 2016 move over by partial testing: monofacial modules, and bifacial modules declared at 300 W/m², repeat a shorter set of sequences than bifacial modules declared above that. The transition guideline sets out which.

Series and BOM changes. Representative models are chosen under clause 4 of IS 14286 (Part 1) and get complete testing; series models and changes to the bill of materials are retested under IS/IEC TS 62915. BIS recognises 11 laboratories for IS/IEC 61730.

Solar inverters: two items, different standards

The order splits inverters into two items, and the difference decides which tests you need.

  • Power inverters for use in PV power systems need IS 16221 (Part 2):2015, the safety standard (IEC 62109-2), and IS/IEC 61683:1999, which sets out how to measure the efficiency of power conditioners. The maker declares the efficiency of every model, lead and series, and BIS checks it against the test report. See our IS/IEC 61683 guideline summary.
  • Utility-interconnected (grid-tied) inverters need IS 16221 (Part 2):2015, IS 16169:2019 for anti-islanding and IS 17980:2022 for maximum power point tracking (MPPT) efficiency. IS 16169:2019 replaced the 2014 edition, which BIS withdrew on 21 February 2026, and trip settings now follow national grid rules rather than the maker’s own. See our IS 16169 and IS 17980 guideline summary.

All the standards for an item appear in the Standard Mark with the R-number. BIS recognises 17 laboratories for IS 16221 (Part 2), 12 for IS/IEC 61683, 14 for IS 16169 and 13 for IS 17980.

Inverters above 200 kW. Citing limited test facilities, MNRE’s S.O. 3597(E) of 5 August 2025 let SPV inverters above 200 kW, of both items, carry on under self-certification. The maker needed valid IEC certificates for the corresponding standards and test reports from accredited labs. The relaxation was set to run until 30 June 2026 or further orders, whichever came first. That date has passed, so check whether it has been extended before shipping a large inverter without registration.

Home UPS and inverters are a separate item. Units up to 10 kVA are on MeitY’s CRS list under IS 16242 (Part 1), not under the solar order.

Solar batteries: IS 16270:2023

Storage batteries for solar PV use need registration under IS 16270:2023. Amendment No 1 limits the standard to off-grid solar PV use and adds a 0.2 It discharge for lithium batteries; BIS has granted no licence without it since 8 December 2025. The standard covers lead-acid as well as lithium and other chemistries, so a lead-acid battery sold for off-grid solar needs registration even though other lead-acid batteries do not. IS 16270:2014 was withdrawn on 23 June 2026. BIS recognises 27 laboratories for IS 16270. Our batteries guide compares this with the rules for lithium-ion, dry cell and EV batteries.

Solar DC cable: ISI mark under IS 17293

DC cable for PV systems rated up to 1500 V DC needs an ISI mark licence under IS 17293:2020. DPIIT’s Solar DC Cable and Fire Survival Cable (Quality Control) Order, 2023, S.O. 3807(E) of 24 August 2023, came into force six months after publication. As this is Scheme-I, BIS inspects the factory before granting a licence, and overseas factories apply under the Foreign Manufacturers Certification Scheme. Cable made in India for export is outside the order. The BIS product manual calls for a 100 m sample and annealed tinned copper wire to IS 8130 as the conductor material. BIS’s records show 50 licences for IS 17293, 49 of them operative, and 10 recognised laboratories. The same order covers fire survival cable under IS 17505 (Part 1), which is not a solar product.

Solar water heaters: ISI mark under the 2024 thermal order

MNRE’s Solar Thermal Systems, Devices and Components (Quality Control) Order, 2024, S.O. 4485(E), was published on 14 October 2024 and came into force 180 days later, in April 2025. It puts three products under the ISI mark (Scheme-I):

  • Flat plate collectors for solar water heating, IS 12933 (Parts 1 and 2). Part 1 was revised in 2025 and the 2003 edition withdrawn on 31 January 2026. BIS’s records show 30 licences, all operative.
  • All-glass evacuated tube solar water heating systems, IS 16544:2016. BIS’s records show 71 licences, 69 of them operative.
  • Direct insertion type storage water tanks for all-glass evacuated tube collectors, IS 16542:2016.

Goods made for export are outside the order. The order says the latest version of each standard applies from the date BIS publishes it.

Solar products and lists that are not BIS

  • ALMM. MNRE’s Approved List of Models and Manufacturers is a separate list for the projects it covers. It is a procurement list, not a BIS licence: being on it does not replace BIS registration of the module, and BIS registration does not put a model on it.
  • Solar cells and wafers on their own are not items in the BIS order, which lists modules. MNRE handles cells and wafers through ALMM’s own lists for covered projects.
  • Goods for export. All three solar orders exempt goods meant for export; for DC cable, the exemption is for cable made in India for export.
  • Solar pumps. Solar PV water pumping systems with centrifugal pumps are in the draft Pumps (Quality Control) Order, 2026 under IS 17018 (Part 1). It has not been notified, so BIS certification for them is not yet compulsory.

Testing

Registration under the 2025 solar order starts with a test report from a BIS-recognised laboratory in India, for each representative or lead model. ISI licences for DC cable and solar water heater parts follow a factory inspection, with samples tested at a BIS or BIS-recognised laboratory. Our NABL accredited laboratory tests solar PV cables to IS 17293 and solar batteries to IS 16270.

BIS product pages for solar products

Frequently asked questions

Is BIS certification mandatory for solar panels in India?

Yes. Crystalline silicon and thin-film PV modules sold in India must be registered with BIS and carry the Standard Mark under MNRE's Solar Systems, Devices and Components Goods Order, 2025 (S.O. 492(E)). Modules made for export are outside the order.

Which BIS standards apply to solar panels?

IS 14286 (Part 1):2023 with the section for the technology (Section 1 for crystalline silicon, Sections 2, 3 and 4 for CdTe, amorphous silicon and CIGS thin-film), plus IS/IEC 61730-1 and 61730-2 for safety. BIS is moving modules to the 2023 editions of IS/IEC 61730, with the 2016 editions accepted until 15 February 2027.

Is there a minimum efficiency for BIS registration of solar panels?

Yes. Clause 10 of the 2025 order makes a minimum efficiency at standard test conditions a condition of grant: 18% for monocrystalline and thin-film modules and 17% for polycrystalline modules, calculated from the module's maximum power and its front surface area.

Do solar inverters need BIS certification?

Yes. Inverters for PV power systems need registration under IS 16221 (Part 2) for safety and IS/IEC 61683 for efficiency. Grid-connected (utility-interconnected) inverters need IS 16221 (Part 2), IS 16169 for anti-islanding and IS 17980 for MPPT efficiency. Inverters above 200 kW had a self-certification relaxation that was set to run until 30 June 2026.

Is ALMM the same as BIS certification?

No. ALMM, MNRE's Approved List of Models and Manufacturers, is a procurement list that decides which modules and cells can be used in the projects it covers. It is not a BIS licence and does not replace BIS registration.

Do solar water heaters need BIS certification?

Their main parts do. Flat plate collectors (IS 12933), all-glass evacuated tube systems (IS 16544) and the storage tanks for evacuated tube systems (IS 16542) need an ISI mark licence under MNRE's Solar Thermal Systems, Devices and Components (Quality Control) Order, 2024.

Related pages

BIS lists checked 10 November 2026. Orders change often; confirm the current notification before applying.

Not sure which certification your product needs?

Talk to a team led by former BIS Directors. We'll map every approval your product needs before you spend on testing.

Call WhatsApp Get a quote