BIS Guidelines for IS 16102 (Part 1):2026, Self-Ballasted LED Lamps (Feb 2026)

How self-ballasted LED lamp licences and applications move to IS 16102 (Part 1):2026, with the last date extended to 2 February 2027.

Issued byBureau of Indian Standards, Registration Department
ReferenceIS 16102 (Part 1)
Edition24 February 2026
Length3 pages, PDF
StatusIn force. The last date of implementation was extended to 2 February 2027 by the circular of 31 July 2026, after which IS 16102 (Part 1):2012 is withdrawn.
Official copycrsbis.in
Our copyDownload PDF, saved from the official source

Changed by later circulars

  • 31 July 2026: Extension in date of implementation of IS 16102 (Part 1):2026 (IS 16102 (Part 1)/02)

    Moves the last date of implementation of IS 16102 (Part 1):2026 from 2 August 2026 to 2 February 2027. The other terms of the February 2026 guideline stay the same.

    PDF Official

What this document is

IS 16102 (Part 1):2012, the safety standard for self-ballasted LED lamps for general lighting, has been revised and published as IS 16102 (Part 1):2026. On 24 February 2026 the BIS Registration Department issued this three-page guideline explaining how licensees and applicants make the change. It took effect immediately.

Key dates

  • 24 February 2026: guideline issued, in force immediately.
  • 2 August 2026: the original last date of concurrent running.
  • 31 July 2026: BIS extended the last date of implementation.
  • 2 February 2027: the last date now. After it, IS 16102 (Part 1):2012 stands withdrawn and no licence stays operative without compliance with the 2026 edition.

Existing licensees

  1. Move to IS 16102 (Part 1):2026 by 2 February 2027.
  2. Submit complete test reports from a BIS-recognised laboratory for every lead model in the licence that was tested to the 2012 edition.
  3. Give an undertaking that the other series models in the licence also meet the 2026 edition.
  4. If this is not done by the deadline, BIS may cancel the licence or remove models from it.

New applicants and changes in scope

  • Applications whose samples were already at the laboratory, or whose reports were already issued, can go ahead under the 2012 edition.
  • New applications can be made under either edition. Under the 2012 edition, the applicant declares it will implement the 2026 edition by the last date.
  • No licence is granted under the 2012 edition after the last date.
  • Changes in scope follow the applicant rules. Under the 2012 edition they are allowed only until the licensee switches over or until the last date, whichever is earlier.

What changed in the standard

The annexure lists the main changes, for general guidance:

  • Lamps with a rated input power up to 60 W are now covered.
  • LED lamps with non-removable rechargeable batteries are now covered.
  • New tests for photobiological safety, abnormal operating conditions, ingress protection and the axial strength of Edison caps.
  • Fault condition tests have been modified.
  • New marking for photobiological safety, and for lamps whose bulbs are not suitable for contact with water.

Status

The guideline is current, with the deadline extended to 2 February 2027. The Phase II series guidelines still set the rules for grouping LED lamps into a series. BIS has issued similar guidelines for LED luminaires under IS 10322 and LED modules under IS 16103 (Part 1):2025.

Products this document applies to

Each product page shows the Indian Standard, the notifying order and how to register.

About IS 16102 and its BIS labs

Frequently asked questions

What is the last date to move an LED lamp licence to IS 16102 (Part 1):2026?

2 February 2027. The guideline first set 2 August 2026, and BIS extended it on 31 July 2026. After that date IS 16102 (Part 1):2012 is withdrawn, and a licence that has not moved to the 2026 edition stops being operative.

What must an existing LED lamp licensee submit?

Complete test reports from a BIS-recognised laboratory for every lead model in the licence that was tested to the 2012 edition, plus an undertaking that the other series models also meet the 2026 edition.

Can a new LED lamp application still be filed under the 2012 edition?

Yes, until the last date of implementation, with a declaration that the applicant will implement the 2026 edition by that date. No licence is granted under the 2012 edition after it.

More in Product standards

Also on our CRS guidelines page: Series guidelines · CRS FAQs · IS/IEC 62368-1:2023 migration · Solar PV

All CRS guidelines and FAQs

Related guides from our team

This page is our summary of an official document, written for general guidance. The PDF is the authoritative text. BIS and MeitY revise these documents from time to time, so check the official source or speak to our team before acting. Published 24 February 2026.