BIS Guidelines for IS 16242 (Part 1):2025, UPS and Inverters (Aug 2025)

How UPS and inverter licences and applications move to IS 16242 (Part 1):2025/IEC 62040-1:2017 + Amd 1 + Amd 2, with the last date extended to 19 November 2026.

Issued byBureau of Indian Standards, Registration Department
ReferenceIS 16242 (Part 1)
Edition21 August 2025
Length3 pages, PDF
StatusIn force. The last date of implementation was extended to 19 November 2026 by the circular of 15 October 2025, after which IS 16242 (Part 1):2014 is withdrawn.
Official copycrsbis.in
Our copyDownload PDF, saved from the official source

Changed by later circulars

  • 10 October 2025: Guidelines for implementation of IS 16242 (Part 1):2025/IEC 62040-1:2017 +AMD1:2021 +AMD2:2022 CSV (IS 16242 (Part 1))

    Corrects the standard number. It is to be read as IS 16242 (Part 1):2025/IEC 62040-1:2017 +AMD1:2021 +AMD2:2022 CSV. The other terms of the August 2025 guideline stay the same.

    PDF Official
  • 15 October 2025: Extension of last date of implementation of IS 16242 (Part 1):2025/IEC 62040-1:2017 +AMD1:2021 +AMD2:2022 CSV (IS 16242 (Part 1))

    Moves the last date of implementation from 19 November 2025 to 19 November 2026. The other terms of the August and October 2025 circulars stay the same.

    PDF Official

What this document is

IS 16242 (Part 1):2014/IEC 62040-1:2008, the general and safety standard for uninterruptible power systems, has been revised and published as IS 16242 (Part 1):2025/IEC 62040-1:2017. On 21 August 2025 the BIS Registration Department issued this three-page guideline explaining how licensees and applicants make the change. It took effect immediately.

Two later circulars change it. On 10 October 2025 BIS corrected the standard number, which is to be read as IS 16242 (Part 1):2025/IEC 62040-1:2017 +AMD1:2021 +AMD2:2022 CSV. On 15 October 2025 BIS extended the deadline by a year. Both are listed above.

Key dates

  • 21 August 2025: guideline issued, in force immediately.
  • 19 November 2025: the original last date of concurrent running.
  • 10 October 2025: standard number corrected to include IEC Amendments 1 and 2.
  • 15 October 2025: BIS extended the last date of implementation.
  • 19 November 2026: the last date now. After it, IS 16242 (Part 1):2014 stands withdrawn and no licence stays operative without compliance with the 2025 edition.

Existing licensees

  1. Move to IS 16242 (Part 1):2025 by 19 November 2026.
  2. Submit complete test reports from a BIS-recognised laboratory for every lead model in the licence that was tested to the 2014 edition.
  3. Give an undertaking that the other series models in the licence also meet the 2025 edition.
  4. If this is not done by the deadline, BIS is to start cancellation of the licence or removal of models from it.

New applicants and changes in scope

  • Applications whose samples were already at the laboratory, or whose reports were already issued, can go ahead under the 2014 edition.
  • New applications can be made under either edition until the last date. Under the 2014 edition, the applicant declares it will implement the 2025 edition by that date.
  • No licence is granted under the 2014 edition after the last date.
  • Changes in scope follow the applicant rules. Under the 2014 edition they are allowed only until the licensee switches over or until the last date, whichever is earlier.

What changed in the standard

The annexure lists the main changes, for general guidance:

  • IEC 62477-1:2012 is used as a reference document.
  • A definition of movable UPS has been added.
  • The clause on flammability of enclosure materials has been modified.
  • More working voltages in the creepage distance test, and extra requirements in the steady force, handle and control securement, touch current and temperature rise tests.
  • The capacitor discharge test changes for pluggable type B UPS, with an added requirement for permanently connected UPS. The input current test is also modified.
  • New tests for short-time withstand current, unsynchronised load transfer, loss of coolant, dry heat, damp heat and hydrostatic pressure.

Status

The guideline is current. The deadline of 19 November 2026 is close, so licensees who have not yet submitted 2025-edition reports should act now. The Phase II series guidelines still set the rules for grouping UPS models into a series.

Products this document applies to

Each product page shows the Indian Standard, the notifying order and how to register.

About IS 16242 and its BIS labs

Frequently asked questions

What is the last date to move a UPS or inverter licence to IS 16242 (Part 1):2025?

19 November 2026. The guideline set 19 November 2025, and BIS extended it by a year on 15 October 2025. After that date IS 16242 (Part 1):2014 is withdrawn, and a licence that has not moved to the 2025 edition stops being operative.

Which edition of IEC 62040-1 does the revised standard follow?

BIS's circular of 10 October 2025 says the standard is to be read as IS 16242 (Part 1):2025/IEC 62040-1:2017 +AMD1:2021 +AMD2:2022 CSV. The revised standard therefore includes IEC Amendments 1 and 2.

What must an existing UPS licensee submit?

Complete test reports from a BIS-recognised laboratory for every lead model in the licence that was tested to the 2014 edition, plus an undertaking that the other series models also meet the 2025 edition.

More in Product standards

Also on our CRS guidelines page: Series guidelines · CRS FAQs · IS/IEC 62368-1:2023 migration · Solar PV

All CRS guidelines and FAQs

Related guides from our team

This page is our summary of an official document, written for general guidance. The PDF is the authoritative text. BIS and MeitY revise these documents from time to time, so check the official source or speak to our team before acting. Published 21 August 2025.