Skip to content
Product standards

BIS Guidelines for IS 302 (Part 1):2024, Adapters for Household Appliances (Nov 2024)

How licensees and applicants for adapters for household and similar electrical appliances move to IS 302 (Part 1):2024/IEC 60335-1:2020, with the last date extended to 23 February 2027.

Issued byBureau of Indian Standards, Registration Department
ReferenceIS 302 (Part 1)
Edition27 November 2024
Length3 pages, PDF
StatusIn force. The last date of implementation has been extended twice and is now 23 February 2027, by the circular of 21 January 2026.
Official copycrsbis.in
Our copyDownload PDF, saved from the official source

Changed by later circulars

  • 20 February 2025: Extension of last date of implementation of revised IS 302 (Part 1):2024/IEC 60335-1:2020 (IS 302 (Part 1))

    Moves the last date of implementation for adapters from 23 February 2025 to 23 February 2026. The other terms of the November 2024 guideline stay the same.

    PDF Official
  • 21 January 2026: Extension of last date of implementation of revised IS 302 (Part 1):2024/IEC 60335-1:2020 (IS 302 (Part 1))

    Moves the last date again, from 23 February 2026 to 23 February 2027. The other terms of the November 2024 guideline stay the same.

    PDF Official

What this document is

Adapters for household and similar electrical appliances are under compulsory registration, Scheme II of the BIS (Conformity Assessment) Regulations, 2018. They are tested to IS 302 (Part 1), the general safety requirements for household appliances. The 2008 edition has been revised and published as IS 302 (Part 1):2024/IEC 60335-1:2020.

On 27 November 2024 the BIS Registration Department issued this three-page guideline explaining how licensees and applicants for these adapters make the change. It took effect immediately.

Key dates

  • 27 November 2024: guideline issued, in force immediately.
  • 23 February 2025: the original last date of concurrent running.
  • 20 February 2025: first extension, to 23 February 2026.
  • 21 January 2026: second extension, to 23 February 2027. After that date no adapter licence stays operative, and none is granted, under IS 302 (Part 1):2008.

Existing licensees

  1. Move to IS 302 (Part 1):2024/IEC 60335-1:2020 by 23 February 2027.
  2. Submit complete test reports from a BIS-recognised laboratory for every lead model in the licence that was tested to the 2008 edition.
  3. Give an undertaking that the other series models in the licence also meet the 2024 edition.
  4. If this is not done by the deadline, BIS is to start cancellation of the licence or removal of models from it.

New applicants and changes in scope

  • New applications under the 2008 edition are accepted only up to one month before the last date of implementation.
  • Applications already in process under the 2008 edition continue, with an undertaking to change over to the 2024 edition before the last date.
  • No licence is granted under the 2008 edition after the last date.
  • Changes in scope follow the applicant rules. Under the 2008 edition they are allowed only until the licensee switches over or until the last date, whichever is earlier.

What changed in the standard

The guideline lists the main changes, for general guidance. Among them:

  • Text aligned with the latest editions of the dated references, with many notes turned into normative text.
  • Clearer rules for PELV circuits and for measuring power input and rated current when they vary over the operating cycle.
  • Mechanical strength and moisture resistance tests for appliances with integral pins that plug into socket-outlets.
  • New requirements for battery-operated appliances, including a new clause 12 on charging metal-ion batteries.
  • Limits on the output voltage of accessible SELV outlets, connectors and USB ports under abnormal operation.
  • New requirements for optical radiation hazards, and for appliances with user-accessible socket-outlets or a functional earth.
  • A revised Annex R on software evaluation, a new Annex T on UV-C effects on non-metallic materials, and a new Annex U on cyber security for remote communication over public networks.
  • Software Class B and Class C deleted, and new component requirements for items such as thermal links, relays and cord sets.

The PDF has the full list of 29 items.

Status

The guideline is current, with the deadline extended to 23 February 2027. Our page on BIS registration for household adapters covers the product itself.

Products this document applies to

Each product page shows the Indian Standard, the notifying order and how to register.

About IS 302 and its BIS labs

Frequently asked questions

What is the last date to move an adapter licence to IS 302 (Part 1):2024?

23 February 2027. The guideline set 23 February 2025. BIS extended it to 23 February 2026 on 20 February 2025, and again to 23 February 2027 on 21 January 2026. After that date a licence stops being operative unless compliance with the 2024 edition has been shown.

Until when can a new adapter application be filed under IS 302 (Part 1):2008?

The guideline accepts new applications under the 2008 edition up to one month before the last date of implementation. With the last date now 23 February 2027, that points to about 23 January 2027. Applications under the 2008 edition need an undertaking to change over before the last date.

Does this guideline cover other appliances tested to IS 302?

No. It is written for adapters for household and similar electrical appliances under Scheme II, and both extension circulars name that product. Other appliances tested to IS 302 parts are not covered by it.

More in Product standards

Also on our CRS guidelines page: Series guidelines · CRS FAQs · IS/IEC 62368-1:2023 migration · Solar PV

All CRS guidelines and FAQs

Related guides from our team

This page is our summary of an official document, written for general guidance. The PDF is the authoritative text. BIS and MeitY revise these documents from time to time, so check the official source or speak to our team before acting. Published 27 November 2024.

Planning a CRS registration?

We group your models, choose the lead models and file on the CRS portal, so testing runs once.

Call WhatsApp Get a quote