BIS Guidelines for Verifying Rated Capacity of Lithium Cells and Batteries (Feb 2026)

Lithium cells and batteries registered under IS 16046 (Part 2) must also have their rated capacity measured to clause 7.3.1 of IS 16047 (Part 3), with 30 April 2027 the key date.

Issued byBureau of Indian Standards, Registration Department
ReferenceIS 16046 (Part 2)
Edition10 February 2026
Length4 pages, PDF
StatusIn force from 10 February 2026. Licences valid up to 30 April 2027 must show compliance by that date, and no licence is granted after it without the rated capacity result.
Official copycrsbis.in
Our copyDownload PDF, saved from the official source

What this document is

IS 16046 (Part 2):2018/IEC 62133-2:2017 is the safety standard for portable sealed secondary lithium cells and batteries under MeitY’s Electronics and Information Technology Goods (Requirements for Compulsory Registration) Order, 2021. The standard requires the rated capacity to be declared on the cell or battery.

On 3 February 2026 MeitY issued an order (No. W-47/14/2024-IPHW) noting complaints of misdeclared capacity. It requires rated capacity to be measured by the method in clause 7.3.1 of IS 16047 (Part 3) and reported for compliance under IS 16046 (Part 2). It asked BIS to revise the test report format and issue guidelines.

On 10 February 2026 the BIS Registration Department issued this four-page guideline to put the order into effect. MeitY’s order is attached as an annexure. The guideline took effect immediately.

Key dates

  • 3 February 2026: MeitY order on measuring rated capacity.
  • 10 February 2026: BIS guideline issued, in force immediately.
  • 30 April 2027: deadline for licences valid up to that date, and the last date for grants without the capacity result.
  • 1 May 2027: MeitY’s date for the requirement to apply to new registrations, inclusions and renewals.

MeitY’s order also says existing registrations stay valid for their validity period, provided surveillance samples show rated capacity within the specified limits.

Existing licensees

  1. If the licence is valid up to 30 April 2027, show compliance with clause 7.3.1 by 30 April 2027. If it is valid beyond that, show compliance by the last date of validity of the licence.
  2. Submit test reports from a third-party laboratory for every lead model in the licence. Generate the test request through LIMS under IS 16046 (Part 2) and apply online through the Standard Revision/Amendment/Essential Requirement module.
  3. The laboratory cites the test report number under which the models were tested for safety to IS 16046 (Part 2), and reports the measured capacity under Clause 4 of the modified unified test report format.
  4. Give an undertaking that the remaining models also comply with clause 7.3.1.
  5. If this is not done by the applicable date, BIS may suspend or cancel the licence, or remove models from it.

New applicants and changes in scope

  • Applications whose samples were already at the laboratory, or whose reports were already issued, are processed without the extra test.
  • Applications in process under IS 16046 (Part 2) continue, with an undertaking to submit the capacity report by the last date of licence validity.
  • After 30 April 2027, no licence is granted under IS 16046 (Part 2) unless the test report includes the rated capacity result.
  • Changes in scope follow the applicant rules.

What the test is

The test is clause 7.3.1 of IS 16047 (Part 3):2018/IEC 61960-3:2017, discharge performance at 20 °C (rated capacity). The guideline covers lithium cells and batteries under IS 16046 (Part 2). It does not mention nickel systems under IS 16046 (Part 1). Our guide to battery testing under IS 16046 and UN 38.3 covers the laboratory side.

Status

The guideline is current. Plan capacity tests for lead models before 30 April 2027, or before your licence’s validity ends if that is later. Grouping of cells and batteries into a series still follows the Phase II series guidelines.

Products this document applies to

Each product page shows the Indian Standard, the notifying order and how to register.

About IS 16046 and its BIS labs

Frequently asked questions

By when must existing lithium battery licensees submit a rated capacity report?

It depends on licence validity. If the licence is valid up to 30 April 2027, by 30 April 2027. If it is valid beyond that, by the last date of validity of the licence. Reports are needed for every lead model, with an undertaking for the other models.

Which test is required?

Discharge performance at 20 °C (rated capacity), clause 7.3.1 of IS 16047 (Part 3):2018/IEC 61960-3:2017. The laboratory reports the measured capacity under Clause 4 of the modified unified test report format for IS 16046 (Part 2):2018/IEC 62133-2:2017.

Do new applicants need the capacity test now?

Applications whose samples were already at the laboratory, or whose reports were already issued, go ahead without it. Applications in process continue with an undertaking to submit the capacity report by the last date of licence validity. After 30 April 2027 no licence is granted under IS 16046 (Part 2) unless the test report includes the rated capacity result.

More in Product standards

Also on our CRS guidelines page: Series guidelines · CRS FAQs · IS/IEC 62368-1:2023 migration · Solar PV

All CRS guidelines and FAQs

Related guides from our team

This page is our summary of an official document, written for general guidance. The PDF is the authoritative text. BIS and MeitY revise these documents from time to time, so check the official source or speak to our team before acting. Published 10 February 2026.

Planning a CRS registration?

We group your models, choose the lead models and file on the CRS portal, so testing runs once.

Call WhatsApp Get a quote